Skip to the content
Conform User Guide

Test it: testing a control now

Test it is on every control: on the unit screen, in the testing panels, on the checklist page and on Control Criticality. It takes you to the quickest sensible place to test that control.

What it does

  • If the control already has a test on the board: it opens that test.

  • If not, and its scheduled test is due: it starts the scheduled test.

  • If not, and nothing is due: it starts an extra test, which never moves the regular schedule.

Then:

  • if you can answer checks at the test's stage, the Test Runner opens;

  • otherwise the Activity Board opens with the card picked, so you can move it on.

Test it never moves a test through the workflow for you. It only starts it and takes you there.